Key project of Gaoqiao Overpass Bridge located in juncture of urban Shaoxing City and Shaoxing County has been on the way of construction since March 20th, which means the blockage problem on No 104 National Expressway will be solved in two years.
No 104 National Expressway Shaoxing Gaoqiao Overpass Bridge bestrides railway, road, and old canal. According to the construction proposal, the overpass bridge will be a round vehicle and bicycle separating interflow one, and the endless track and ring road will complete the transportation for No 104 National Expressway and ShaoQi (Shaoxing to Qixian) Road. As for the details of the project, there are 8 bridges, 2 main bridges crossing No 104 National Expressway, 6 ring bridges, 2 underground bicycle passages, one under the expressway and another for Xiaoyong (Xiaoshan to Ningbo) railway. The first level of the overpass bridge is ShaoQi Road, bicycle traffic lane undergrounds No 104 National Expressway and Xiaoyong railway, the second one is No 104 National Expressway, and the third one is Shaoqi Road overhead passing No 104 National Expressway and Xiaoyong Railway and direction transfer traffic lane.
The relevant department will control the traffic in the perimeter roads during the construction period, citizens shall walk following the mark. In addition, according to the concerned staff, drivers shifting from Keqiao and urban Shaoxing, it’s better not to choose that way, and making a detour will not only ease the traffic pressure, but also save their time.